Priority | JOB | Finished to/date |
Assigned by/date |
Inspected By/Date |
Procedure Done |
PDSA |
A | Operate Warehouse fans on CO level | |||||
A1 | Fix, paint and kickplate North Dooor | |||||
A | Lunch room door - Lock Cover Plate for Weatherstrip | |||||
A | Clean out Area wells, especially Air Intake. | |||||
A | Fix drain in air intake or install peristaltic pump. Get a price from a contractor to cut concrete to get at pipe and fix. | |||||
A | E1 fan inlet expansion joint Replacement if needed. | |||||
A | Drain generator, replace generator engine rubber, flush radiator and refill antifreeze. | |||||
A | Inventory bad ceiling tiles and check MR for replacements. Order replacements if needed. | |||||
A | Epoxy 207 warehouse floor - match existing | |||||
A | Do & Put Maintenance Check List Online | |||||
B | Cooling Tower fan belts look loose. Replacement if needed. | |||||
B | Install generator CO monitor on EP | |||||
B | Run engine with hand held CO monitor to find leak. | |||||
B | Grease all fan and pump bearings (fans ER1,2,3 done) | |||||
B | E1 fan inlet plenum has a come-a-long ?? remove | |||||
B | FIX or replace Generator Transfer Switch | |||||
B | Redo 207 Bathroom vent fans | |||||
C | Replace temporary lighting wire in warehouse | |||||
C | Rewire elect room exaust fan on EP | |||||
C | Check out LP-B 30 AMP breaker and update list | |||||
C | Paint 212 floor and West stairs | |||||
C | Wire shipping computer and light on UPS | |||||
C | Rewire 212 router on UPS | |||||
C | Fix Bathroom Soap Dispensers | |||||
C | Paint Structures on Roofs | |||||
C | Wallpaper boardroom and elevator areas | |||||
C | Clean wallpaper in bathrooms | |||||
Done | Do light Bulbs in all buildings | |||||
Done | Dry Marker Boards in conference rooms | |||||
Done | Flip Charts in Conference Rooms | |||||
PDS | Seal north stairwell at roof | |||||
PDS | Fix Express AC condensate leak | |||||
Lab hood bafffle plates | ||||||
Add 300 pounds to fan inertia pad to see how much the natural frequency changes. | ||||||
Sketch a plan for board room closet | ||||||
Set up manual for cleaning | ||||||
Change oil on generator | ||||||
Intern feedback each month | ||||||
Mentor feedback each month | ||||||
Landscape plan | ||||||
Door kickplates | ||||||
Ceiling tiles replace and repair | ||||||
Carpet replace | ||||||
Room inspections | ||||||
Volleyball court repair | ||||||
Drywall repair | ||||||
Paint Structures on Roofs | ||||||
207 Space heater stack fix | ||||||
Clean and detail old trucks | ||||||
Ask each team for their list of most annoying stuff | ||||||
Clean truck dock drains and make cover screen | ||||||
Intern summer shirts |