0   Video Conference Plan    
0   Cooling Tower Leak    
0   Lab Sample Door lock    
0 Not Poss. Lunchroom door lock protector plate like main door    
0   Balance Bathroom ventilator fan    
0   Do Maintainence Punch Schedule    
0 HVAC T Separate phone calling devise for cool or wet building    
1   Trim Bradford Pear Tree    
1   Fix or Replace Lab Fan    
1   Check all Air ducts from VAV and Valve opps    
1   Clean and repair Drivit see truck dock.     D Art Install all Door Hardware 1st floor 1 D Pat Wood Solvent Room ramp 1
1   Sign for Wood street at Quintin     D Capital Reduce 1 D Art Install all Door Hardware LL 1
1   Sign for entrance     D Capital Leak outside Rich Kings office 1 D Dim Tile Stair tread Main (cut carpet to fit until mat arrives ) 1
1   Sign for delivery trucks    
2   Cooling Tower Cleaning     D Capital Lunch Room Lock 1 D Pat Wood Paint prep room corner 1
2   OA temper sensor     D Capital Fix Leak in South Atrium Window 1 D Pat Wood Perchloric hood wiring 1
2   Temp Sensor for Boiler Water Loop     D Dim Tile Entry floor tile finish 1 D Pat Wood Lunch Room door New Sill & support 1
2   Lab Doors closing quality     D Dim Tile Lunch Room floor tile repair 1 D Pat Air Leak in Lab 9 @ floor 1
2 Check for leak Detail north stairwell and seal top of blocks to roof     D Dim Tile Stair tread North 1 D Pat Wood Main Entrance Stationary Door Keylock Dead bolts 1
2   Detail all rooms 1 at a time     D Dimen Tile Repair Tile outside lunch room 1 D Pat Wood Install new Tumblers on 4 door outside doors 1
2   Closet in Board room     D DONE Bolt Wall above solvent room 1 D Pat Wood Door Latch Guards and auto close Adjustments 1
2   Reveal Fix     D DONE Modular furniture hookup 1 D Pat Wood Electric Lock problems with Bolt hold close 1
2 Artium Leak in Board Room     D DONE Paint West stairwell 1 D Pat Wood Cover hole in 1st floor conference rm 1
3 Cooling Tower Water Sieve     D DONE Pipe Insulation for all vertical drain pipes 1 D Pat Wood Clean Return Air Grills 1
3   Replace or fix stained Ceiling Tile     D DONE Reset North Door and install Latch wire 1 D Larry Balance air flows S2 1
3 Check for opps Perchloric hood flow analog to program   2 D DONE Walker duct tombstones 1 D Larry Balance air flows S3 1
3 Can lights for outside and Atrium Entry   R D ED Unistrut in 1st Floor Conference Room 1 D Pat Wood Closet Door Facia 1
3 Partial 2002 & 2003 Old lab roof HVAC unit econimizer   R D Jim Security system UPS outlet 1 D Pat Wood Lunch Room Pipe remove pipe 1
4 Main Door Card Reader     D Northwest Finish Carpet 1 D BoB S Paint north door inside and out 1
4   Truck Exhaust Fan   1 D Pat Wood Closet Rods and shelfs see Adele or Carole (Closetmaid) 1 D Bob/Wally Move VAV to Lab 9 1
4 PART 2002 Seal Kitchen Door   1 D Pat Wood North door closer 1 D Carole Main Door Mat 1
5   Replace Lab Hood Duct on Roof   T D Pat Wood Insulation remove in stairwell heater 1 D Bob Ceiling Stain Causes Janitor Closet 1
5   Heated sample line to Training Room   T D Pat Wood Paint solvent Room 1 D Bob Borrowed light frames 1
5 Plan Wrap Pipes from Presidents Bathroom above 1st floor   T D Pat Wood Clean Tile in North Stairwell 1 D Bob Clean Inside Windows Atrium 1
5   1st Floor Recpetion Area Coat Closet Plan   1&2 D Pat Wood Elevator Carpet 1 D Bob Redo ceiling tile in 1st floor bathrooms 1
5   Electric Panel Directories E D Pat Wood HR wall top OAK 1 D Bob Measure air flows ER2 1
5   Truck dock building protection pier (see Dwg A1)   MR D Pat Wood HD Closer on door near truck dock 1 D Bob Measure air flows ER3 1
6   Replace Cooling Tower   L D WACO Doghouses for St. Charles hookup in lab 4 1 D Bob Paint 207 Warehouse Walls and Ceiling   1
6   207 Roof work and FLASHING over drive in door   MR D Art Perchloric duct leaks under roof 2 H Bob/Wally Stair tread West 1
6 Done Easels for all conference rooms   MR D Art Door Hardware 2nd floor 2 D DPCM Duct Noise is excessive even with E1 off on a windy day 2
7   Fix bad grass spots   1 D DONE Hook up reception desks 2 D Pat Wood Pres Coffee light move to over sink and fill holes 2
7 PART 2002 Dirt to fill in behind curbs   1 & 2 D DONE Install Bathroom Towel dispenser 2 D Pat Wood Prresidents Bathroom install pressure equalizing grill 2
7   Paint Structure and Pipes in MR   NA D Done T & H Hole in Entry Wall 2 D Carole/Bob Shelves for Resource Center 2
7   Repair Brick on 207 1 D P & P Toliet and Seat in Bill Walker's off 2 D Bob E1 Condensation--need insulation below roof   2
7   Presidents bathroom clean and fix wallpaper   R D Pat Wood Seal wall at top of stairwells @ Scuttle 2 D Bob/Wally Build shelves in janitors rooms   2
7 Done Bathroom fan for 207   1 D Pat Wood West stair well seal top of wall 2 D Carole/Bob Media Center for conf rooms   2
8   Connect Steam Boiler   2 D Pat Wood John's Office finish and move in 2 D Vince UPS and Emergency survey Fix WIW Sue Barb   2
8 HVAC T VAV flow adjustment all boxes   B D Pat Wood Johns office 2 H Bob/Wally Skylight tunnel in library 2
8   Clean up mechanical room   R D Pat Wood Perchloric hood stack chase 2 L Pat Wood Finish beam in wall north stairs 2
8   Flag pole 2 D R & G Mud around outlets 1 & 2 D Bob/Wally UPS for rentals 246
8   Check air flows ER1 w/ red hood & enter on Data sht   2 D Pat Wood Closet bumpers 1 &2 D R & G Drywall around outlets 1&2
8   Smooth MR floor   MR D Pat Fire doors operational ALL D Bill Rearrange spotlights in pres office 1&2
8   Kim and Traci Computer & Phone on UPS   R D Bill Connect Fire Alarm to Fire Dept B D Pat Wood Catwalk above metal ceiling 1&2
9   Volleyball court improvements   2 D Electric Wire generator fan control system B D Pat Wood CAE must install catwalk over metal ceiling 1&2
8   Install handrails on test platform   T D Pat Wood Extra Electric in Dept 61 Area B D Pat Wood Generator Radiator AW
9   Install test platform 50#/ft2 T D Pat Wood Paint Archive room B D WACO Basement ceiling lights B
9   Rig Unistrut gantry to enable lift from truck dock   1 D Done Air Dryer for labs D D DPCM Leaks in Wall in sprinkler room B
9   Sample spiking port   MR D DONE Air Seperator knurled missing D D Pat Wood Air Filter section Missing B
9   Steps for test plateform.   3 D Done Check hood flows D D Bob/Wally Cool Electrical room B
9   Test ports in horizonal and vertical ducts   1 D Done Door latch problem at main entrance D D Bob/Wally Caulk around East Area Well Door and Fill Rad Holes B
9   Trap door for storage under grating in hung box   MR D Done Elevator Sump pump lower level switch D D Bob/Wally Work Area Setup for Electrical in Electical rm B
9   Cut fan pads to size   1 D Done Fire control system test D D Bob/Wally Work Area Setup Carpentry just outside MR B
9   Mech room fixup   MR D DONE Fix air compressor leak D D Bob Greenfield on S3 leads and Wire to outside Rad B
9   Paint Structure in MR   MR D Done Grind spatter off stairwell wall D D Bob/Wally Archive build shelves plan 1st B
D   Run wire from MR to SCU 3 & 4   ALL D Done Hang Unit heater for generator D D Bob Build shelves in archive room per plan   B
D Done Dry Mark boards for conference rooms 1 & 2.   MR D Done Landscape trash out of dumpster D D Bob/Wally 207 Roof work at East end E
D   Door Stops instead of  blocks or Hinge Breaker   All D Done Leak check compressed air lines D D Bob/Wally Seal truck dock conduit where jack removed light E
D   CFM w/  current transformer on E3   1 D Done Wire Bachco 4/25 D D Bob Paint 207 walls   E
D   Control for S1HWT MR D Done Wire lab 9 D H Fran fence on old building above entrance E
D HVAC T Energy Saving Thermostats or add to Landis & Gyr(all)   R D DONE Wire west oven 4/12 deadline D D Pat Wood Wire north wall lab 9 plastic plug mold for UPS L
D HVAC T Magnihelics for S1, S2, S3 & ER1 1&2 D P & P Hotwater ON D D Edwards Fix Leaks in Hood Exhaust system L
D HVAC T Plan for Cooling Warehouses   1 D WACO Seal pipes in mechanical room "Guaranteed" D D Pat Wood Lab 4 Plywood PAINT BEFORE INSTALLING! DON'T Paint epoxy walls! L
D HVAC T AC duct to phone closet plan 1 C Pat Wood Purchase and Install new door in Boyle area E D Larry Set Hood Min flows E1 L
D Alex AA and ICP Flow  total in Computer   O D Pat Wood Dumpster Pad and cedar fence E D Bob/Wally Adjust lab hood sash's   L
D Bob Purchase and Install new door in Boyle area  MR D Pat Wood Conference room chair rails and floor molding E D Larry Balance air flows S1   L
D HVAC T Warehouse Cooling improvement plan L D Pat Wood 207 Air Conditioning Condenser fan ER D Bob/Wally Data conduit to 246 LL
D HVAC T Measure E1 Air Volume with Current Transformer   L D DONE Paint and install stairrails in west stairwell I2 D Vince PHONE AND DATA Wire TO RENTALS LL $$$$$$
D HVAC T drawing of generator electric on CADD   MR D P & P Kitchen sink pull downs I2 D Bob/Wally Paint floor in rentals LL
D Bob Thumb Lock to LIBRARY and conference S. door   MR D Campbell Paint 1st floor Closet Door Frames Grey l D Pat Wood Pipe Cover labels MR
D Done Sound proof elevator, sprinkler and Mech rooms   MR D Carole Lab 9 countertop l D Bill Current Transformers MR
D HVAC T Training room  air flow VAV and valve   D Carole Lunch Room vending machines l D Pat Wood Air Compressor on Emergency Generator MR
D HVAC T Freeze protection program on building computer   O D Edwards Lab 5 Return L D Pat wood Install current transformer on E1 MR
D Bob Check all fans for vibration   O D Pat Wood Wire north wall lab 9 for 220 1ph from Emer Gen Sw L D Pat wood Install current transformer on ER1 MR
D   Check s3 coil for leaks O D Pat Wood Lab Hall door dust caps L D Pat wood Install current transformer on E3 MR
D HVAC T Move dept 61 fan switch and install thermostat   2 D Pat Wood Paint Plug Mold L D Larry Condenser pump shutoff overflow problem. MR
D Bob Crate cooling coil LL D Pat Wood DI water for labs L D Bob/Wally Install SP gauge on ER1 duct in MR MR
D HVAC T Humming noise on Board room VAV at 100% S3 MR D Pat Wood AA hoods installation and L & G prog mod L D Bob/Wally Insulate concrete in Inlet Air Plenum MORE ON FOOTING MR
D HVAC T Hotwater room ventilation   D St. Charles Cracked Sashes in Labs L D Edwards BOILER FILL and Presure Problem MR
D HVAC T CFM w/  current transformer on ER1 (S of PDSA) D Bill Chiller startup MR D Bob/Wally Roll steam boiler back 6" toward wall ALIGN MR
D DONE Fix Hinges on Wood Street door   D DONE buy valves for MR water MR D Bob/Wally Boiler relief valves should be piped to drains Lets let this go until Presure relief problem is fixed. MR MR 24-May
  D DONE Cut around S3 leak with Drummel MR D Bob/Wally Bent linkage S1 OA damper west MR
  D DONE Flush Chiller lines MR D Bob/Wally Clean Equip S1-3/ Steam Boiler /Hotwater tank/Gen MR
  D Done Hook up Elect for water treatment MR D Bob/Wally Clean out sump and settling holes. MR
  D DONE Leak in S3 coil MR D Bill W Boiler lead lag control MR
  D Edwards Access to grease fan bearings MR D Bob/Wally Fix ABB S2 Drive MR
D Ewdards Signs for piping in MR MR S Bob Boiler modulating control   MR
D Hi Tech Install water treatment chemicals MR S Bob Install Gaskets for Damper blades   MR
D P & P Sanitary pump leaks MR S Jim Balance water flow check   MR
D P & P Sump pump leak MR D Pat Wood Gas Pipe Line. on drawing? NA
D Pat Wood Chilled water leak in S3 pipe MR D Bob/Wally Cart for new building NA
D Pat Wood Stack drain with 4" water seal SS to froor drain MR D Jim & Vince Audio Paging System NA
D Pat Wood Area well drain pipes install cover plates on all 3 MR D Vince UPS power audit and plan NA
D Pat Wood Water treatment relay on chiller contact 11 MR D Vince Emergency power audit and plan   NA
D Pat Wood Water treatment interlock with condenser flow MR D Pat Wood Install grating over east area well O
D WACO Rewire ABB drive control wires MR D Carole/Pat Paint Visitor on 4 Parking Spaces O
  D Adele Landscaping bids NA D ED Patio wall flashing on outside of window wall O
  D Dover Elevator oil leak NA D Pat Wood Leaks in MR wall near sumps O
  D Pat Wood Clean elevator except carpet NA D Pat Wood Spread Straw O
    D CAE Order landscaping O D Bill Window clean outside entry O
    D DONE Conduit before Fill behind curbs O D Pat Wood Soil pipe drain on west foundation wall O
          D Landscaper Protect maple tree O D Bob/Wally Remove old Electrical Box by Entrance transformer O
          D Pat Wood Clean up behind curbs, around well and in pond. O D Bob/Wally Caulk Expansion joints O
          D Pat Wood Before landscaping cleanup O D Bob/Wally Power conduit to trailers O
          D Pat Wood Fill front for sidewalk O D Green Rose Replace Dead Trees   O
          D Pat Wood Elevate man hole covers O H Bill Patch holes in parking catch basins O
          D Pat Wood Truck Dock Drain Screen O L Bill Fix brick problems. O
          D RG Repair dryvit O D Pat Wood Insulate E1 inlet plenum and install Dam R
          D Spinolas Finish topsoil O D Pat Wood Set PRE1 volume and speed R
          D Spinolas Remove Concrete from wood st shoulder O D Bill Stack Engineering calcualtions to village R
          D Spinolas Remove old curb and asphalt O D Pat Wood Aim East Flood light or move R
          D DONE Prepare Air Well for Lift truck Delivery PW D Pat Wood Seal Concrete block above patrition wall & paint R
          D Art Perchloric duct leaks above roof R D Pat Wood Flashing cover on south wall R
          D DONE Fan Noise in E1 R D Bob/Wally 207 fix HVAC heat and Ac R
          D DONE Fix latch on roof hatch R D Bob/Wally Paint Structure on roof & Pipes R
          D Done Main Stack and Fan touchup R H Hold Replace Rectangular Duct with Round 36" Dia R
          D Done Paint touch up stack and E1 fan R L Pat Wood Fix hole in membrane roofing R
          D PAt Cooling Tower Fill Valve R D Pat Wood Laundry Tub Drain hook up SR
          D Pat Wood Cooling tower cleanup and hatch cover R D Bob Roof protection under scaffolding T
          D Pat Wood Cooling Tower fix leaks R D Pat Wood Clean roofs
          D Pat Wood Fan Noise e3 or E1 R D Bob Fix S3 Chilled water coil
          D Pat Wood Cooling Tower fix Float Valve R D Bob West man door sticks    
          S Larry & Joe Chiller Automation and restart after outage            
          S Mark Roach Hinge grating over east area well   O L Pat Wood Lunch Room Base trim
          D Bob Paint truck doors   1 D Bob Ceiling Tile fix after Edwards Fixes Staining problem   1
          D Bob Patch area well drain pipe   MR D Bob Welder outlet in MR   MR
          D Liz Screen to seperate training room from Weeze & Walts   B D Bob MR Bolt dampers open in S1, S2, S3   MR
          D Bob Paint 207 bathroom and clean fix tile   D Bob Redo Downlights in presidents office   2
          D Bob Make Main Stair Risers more equal S Bob Interference in mechanical room   MR
          D Bob Sky Light in Library (drop in grid) Add 2 more panels S Bob Roof Problems   R
          D Bob 207 and clean tile floor and walls   D Bob Window mullun to wall gap filler (Jerry Murray's Office)   1& 2
          D Bob Work Area Setup for Mechanical in MR   D Bill Boilers should alternate MR
          D Bob Work Area Setup for welding in MR   D Bob Grout Pumps MR
          D Bob Truck Dock Angle   D Bob Truck dock building protection pier   O
          D Bob Remove grating to paint steel then replace   D Bob Tar on Wall above Drive in Door R