(A) |
Approved |
(C) |
|
|
|
|
|
|
|
|
|
|
|
|
Original |
Change Orders |
Adjusted |
|
|
|
|
|
|
|
|
Type of Work |
|
Contractor (see attached |
|
Contract |
and/or |
Contract |
|
|
|
|
|
|
|
|
|
|
list for addresses) |
Phone |
Amount |
Credits |
Amount (A+B) |
|
|
|
Cellia |
|
|
|
|
- |
|
------------------------ |
|
----------- |
----------- |
----------- |
|
|
|
|
|
|
|
|
Underground |
|
Mancini Sewer & Water |
|
$47,348.00 |
$3,055.00 |
$50,403.00 |
|
|
|
|
|
|
|
|
Excavating |
|
Spinolas Brothers |
? |
$115,000.00 |
$10,208.32 |
$125,208.32 |
|
|
|
Apron south |
$368.00 |
|
|
|
Concrete |
|
Mohawk Contracting Co. |
|
$175,100.00 |
$17,518.55 |
$192,618.55 |
|
|
|
north |
$516.86 |
|
|
|
Steel |
|
Vaughn Industrial Sales |
|
$227,000.00 |
$16,214.00 |
$243,214.00 |
|
|
|
|
$884.86 |
$3,539.45 |
|
|
Curbs |
|
Cella Concrete, Inc. |
|
$18,875.00 |
$9,077.81 |
$27,952.81 |
|
|
|
|
|
|
|
|
Paving |
|
Northern Paving, Inc. |
|
$53,833.00 |
$10,063.25 |
$63,896.25 |
|
|
|
Walks |
$65.98 |
|
|
|
Pre-Cast Slabs |
|
Midwest Flexicore |
|
$42,942.00 |
$2,750.00 |
$45,692.00 |
|
|
|
|
$45.44 |
|
|
|
Roof |
|
Regal Roofing Co. |
847-299-1110 |
$38,375.00 |
$2,630.00 |
$41,005.00 |
|
|
|
|
$1,160.34 |
|
|
|
Plumbing |
|
P & P Plumbing & Heating |
|
$121,000.00 |
$3,756.00 |
$124,756.00 |
|
|
|
|
$307.29 |
|
|
|
Masonry |
|
Hendersons' Construction |
|
$69,500.00 |
$9,643.50 |
$79,143.50 |
|
|
|
$91.67 |
$1,579.05 |
$3,473.91 |
|
|
Exterior Plaster |
|
R.G. Interiors, Inc. |
|
$97,035.00 |
$1,563.00 |
$98,598.00 |
|
|
|
|
|
|
|
|
Dampproof |
|
Air Pressure Dampproofing |
|
$6,625.00 |
|
$6,625.00 |
|
|
|
|
|
$7,013.36 |
$6,989.80 |
|
Atrium |
|
View Thru |
847-352-1232 |
$25,845.00 |
|
$25,845.00 |
|
|
|
|
|
|
|
|
Glass & Glazing |
|
Capitol Glass |
|
$75,731.00 |
$6,747.00 |
$82,478.00 |
|
|
|
|
|
|
|
|
HVAC |
|
Edwards Engineering |
|
$500,000.00 |
$13,762.00 |
$513,762.00 |
|
|
|
|
|
|
|
|
Electrical: |
|
|
|
|
|
|
|
|
|
|
|
$3,341.80 |
|
|
Transformer |
|
Riviera Transformer Co. |
|
$1,541.81 |
|
$1,541.81 |
|
|
|
|
|
|
|
|
Electric |
|
Waco Electric Corporation |
|
$267,500.00 |
$33,759.08 |
$301,259.08 |
|
|
|
|
|
$3,648.00 |
|
|
Fire Protection |
|
Valley Automatic Sprinkler |
|
$46,900.00 |
$4,570.00 |
$51,470.00 |
|
|
|
|
|
$17,279.10 |
|
|
Accoust Ceilings |
|
Noonan |
|
$47,465.00 |
$5,800.00 |
$53,265.00 |
|
|
|
|
|
$200.00 |
|
|
Elevator |
|
Dover Elevator Co. |
|
$35,175.00 |
$125.00 |
$35,300.00 |
|
|
|
|
|
$2,664.28 |
|
|
Drywall |
|
R.G. Interiors Inc. |
|
$94,710.00 |
$1,829.45 |
$96,539.45 |
|
|
|
|
|
$27,133.18 |
|
|
Wood Doors & Frm |
|
Imperial Woodwork |
|
$35,098.00 |
|
$35,098.00 |
|
|
|
|
|
$13,797.00 |
|
|
Metal Doors & Frm |
|
M & F |
|
$18,700.00 |
|
$18,700.00 |
|
|
|
|
|
$13,336.18 |
|
|
Hardware--Doors |
|
Lind |
|
$10,450.00 |
|
$10,450.00 |
|
|
|
|
|
|
|
|
Lab Casework |
|
St. Charles |
|
$103,914.00 |
|
$103,914.00 |
|
|
|
|
|
|
|
|
Carpeting |
|
Northern Carpeting |
|
$20,351.93 |
|
$20,351.93 |
|
|
|
|
|
|
|
|
Floors, |
|
Dimensional Flooring |
|
$32,497.00 |
$3,385.75 |
$35,882.75 |
|
|
|
|
|
|
|
|
Painting |
|
Cambell |
|
$32,535.40 |
$5,806.00 |
$38,341.40 |
|
|
|
|
|
|
|
|
Cabinets & Countertops |
|
St. Charles |
|
$8,091.43 |
|
$8,091.43 |
|
|
|
|
|
|
|
|
Reception Desks /Panel |
|
Hire-Nelson |
|
$23,632.00 |
$3,203.00 |
$26,835.00 |
|
|
|
|
|
|
|
|
Landscaping |
|
Green Rose |
|
$30,000.00 |
|
$30,000.00 |
|
|
|
|
|
|
|
|
Toilet Partitions |
|
Knickerbocker |
|
$4,045.00 |
|
$4,045.00 |
|
|
|
|
|
|
|
|
CMC Ed Hanson |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
HVAC Controls |
|
Landis & Gyr Powers |
|
$130,996.00 |
($4,464.60) |
$126,531.40 |
|
|
|
|
|
|
|
|
Security System |
|
Norman Securities |
|
$15,965.00 |
$1,035.00 |
$17,000.00 |
|
|
|
|
|
|
|
|
Construction Mgmt |
|
DPCM Group |
|
$130,000.00 |
|
$130,000.00 |
|
|
|
|
|
|
|
|
Permits |
|
Palatine Village |
|
$16,205.83 |
|
$16,205.83 |
|
|
|
|
|
|
|
|
Electric-Exterior |
|
Commonwealth Edison |
|
$9,267.95 |
|
$9,267.95 |
|
|
|
|
|
|
|
|
Water Chiller |
|
Carrier Corporation |
|
$51,265.63 |
|
$51,265.63 |
|
|
|
|
|
|
|
|
Heat Boilers: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Boiler |
|
Barr Mechanical Sales |
|
$23,005.00 |
|
$23,005.00 |
|
|
|
|
|
|
|
|
Humidif. Boiler |
|
Steam Sales Corporation |
|
$11,725.36 |
|
$11,725.36 |
|
|
|
|
|
|
|
|
Water Treatment |
|
Hi-Tech |
|
$5,000.00 |
|
$5,000.00 |
|
|
|
|
|
|
|
|
Cooling Tower |
|
Bullack |
|
$2,800.00 |
|
$2,800.00 |
|
|
|
|
|
|
|
|
Air Handling |
|
USA Coil & Air, Inc. |
|
$32,708.00 |
|
$32,708.00 |
|
|
|
|
|
|
|
|
Lab Exhaust Stack & fan |
|
Palatine Welding + CAE+Himelblau |
|
$6,756.20 |
|
$6,756.20 |
|
|
|
|
|
|
|
|
Perchl. Exhaust |
|
spray sys + Chi blow pipe+ Kawanee |
|
$1,105.28 |
|
$1,105.28 |
|
|
|
|
|
|
|
|
Blue Board |
|
Expense |
|
$1,500.00 |
|
$1,500.00 |
|
|
|
|
|
|
|
|
Loading Dock Wall |
|
Expense |
|
$700.00 |
|
$700.00 |
|
|
|
|
|
|
|
|
Generator |
|
O'Brien Machinery |
|
$7,800.00 |
|
$7,800.00 |
|
|
|
|
|
|
|
|
Variable Speed Drives |
|
John Willis Company |
|
$14,000.00 |
|
$14,000.00 |
|
|
|
|
|
|
|
|
Skylights |
|
Aurburn Plastics |
|
$1,359.35 |
|
$1,359.35 |
|
|
|
|
|
|
|
|
Phone System |
|
ADM & Centel |
|
$6,000.00 |
|
$6,000.00 |
|
|
|
|
|
|
|
|
Phone & network Install |
|
Centel |
|
$42,000.00 |
|
$42,000.00 |
|
|
|
|
|
|
|
|
Computer Network |
|
NOT LET |
|
|
|
$0.00 |
|
|
|
|
|
|
|
|
Computer HVAC etc |
|
Computerland |
|
$3,000.00 |
|
$3,000.00 |
|
|
|
|
|
|
|
|
Drywall Lower Level |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Well |
|
|
|
$2,400.00 |
|
$2,400.00 |
|
|
|
|
|
|
|
|
Testing Plateform |
|
Knoll |
? |
$12,000.00 |
|
$12,000.00 |
|
|
|
|
|
|
|
|
Gas Pipe Line |
|
Columbia & R12 |
? |
$1,945.50 |
|
$1,945.50 |
|
|
|
|
|
|
|
|
Architect & Eng. |
|
Blauck |
|
$2,000.00 |
|
$2,000.00 |
|
|
|
|
|
|
|
|
Contingency |
|
|
|
$194,341.25 |
|
$162,037.11 |
|
|
|
|
|
|
|
|
|
|
|
|
----------- |
----------- |
----------- |
|
|
|
|
|
|
|
|
Total Construction Escrow
Cost |
|
|
|
$3,152,661.92 |
$162,037.11 |
$3,282,394.89 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Original Mortgage |
|
|
|
$347,338.08 |
|
$347,338.08 |
|
|
|
|
|
|
|
|
|
|
|
|
----------- |
----------- |
----------- |
|
|
|
|
|
|
|
|
TOTAL CONSTRUCTION LOAN |
|
|
|
$3,500,000.00 |
$162,037.11 |
$3,629,732.97 |
|
|
|
|
|
|
|
|
architech |
|
Ruben Anastacico |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(A) |
(B) |
(C) |
|
|
|
|
|
|
|
|
|
|
|
|
Original |
Change Orders |
Adjusted |
|
|
|
|
|
|
|
|
Type of Work |
|
Contractor |
|
Contract |
and/or |
Contract |
|
|
|
|
|
|
|
|
|
|
|
|
Amount |
Credits |
Amount (A+B) |
|
|
|
|
|
|
|
|
- |
|
- |
|
----------- |
----------- |
----------- |
|
|
|
|
|
|
|
|
Village Fees |
|
Palatine Village |
|
$749.97 |
|
$749.97 |
|
|
|
|
|
|
|
|
Road Extension |
|
Palatine Village |
|
$44,878.00 |
|
$44,878.00 |
|
|
|
|
|
|
|
|
AEI Engineers |
|
|
|
$19,000.00 |
|
$19,000.00 |
|
|
|
|
|
|
|
|
Financing: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Construction Pt. |
|
|
|
$31,850.00 |
|
$31,850.00 |
|
|
|
|
|
|
|
|
Lending Pt. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Realtor Pt. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other Fees |
|
|
|
$15,000.00 |
|
$15,000.00 |
|
|
|
|
|
|
|
|
Interest |
|
|
|
$122,700.00 |
|
$122,700.00 |
|
|
|
|
|
|
|
|
Legal & Acctg. |
|
|
|
$15,000.00 |
|
$15,000.00 |
|
|
|
|
|
|
|
|
Insurance & Taxes |
|
|
|
$15,000.00 |
|
$15,000.00 |
|
|
|
|
|
|
|
|
|
|
|
|
----------- |
----------- |
----------- |
|
|
|
|
|
|
|
|
Other Fees & Soft Costs |
|
|
|
$264,177.97 |
$0.00 |
$264,177.97 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Costs |
|
|
|
$3,764,177.97 |
|
$3,893,910.94 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Requested |
CAE Approved |
DCPM Approved |
Not Allowed |
Approved |
Has been |
|
|
|
|
|
|
|
Mancini Sewer & Water |
|
Extra or Credit |
|
|
|
Backcharge |
Invoiced |
|
|
|
|
|
|
1 |
12" RCP 30 ft long @ basin 7 |
* |
$1,085.00 |
$1,085.00 |
|
|
|
|
|
|
|
|
|
|
2 |
6"PVC pipe from parking lot to str |
* |
$1,970.00 |
$1,970.00 |
|
|
|
|
|
|
|
|
|
|
3 |
36" Sump Basin |
|
$787.50 |
DPCM or NO |
|
$787.50 |
|
|
|
|
|
|
|
|
4 |
Washed stone in basement |
|
$630.00 |
|
|
$630.00 |
|
|
|
|
|
|
|
|
5 |
Connect drain tile where? |
|
$200.00 |
May be CAE |
$200.00 |
|
|
|
|
|
|
|
|
|
6 |
Stone for undercutting to connect |
|
$100.00 |
|
$100.00 |
|
|
|
|
|
|
|
|
|
7 |
Trench backfill in area of drain |
|
$80.00 |
|
$80.00 |
|
|
|
|
|
|
|
|
|
8 |
Iron pipe for storm |
|
$220.00 |
|
|
$220.00 |
|
|
|
|
|
|
|
|
|
Credit for tile installed by CAE |
|
($628.00) |
|
|
|
|
|
|
|
|
|
|
|
|
Fix leaks around pipes thru wall |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$4,444.50 |
$3,055.00 |
$0.00 |
$787.50 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
Spinolas Brothers |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
200 Hitachi for 8 hours |
* |
$800.00 |
$800.00 |
see Ed |
|
|
|
|
|
|
|
|
|
2 |
Extra days for overdig @$400/day |
* |
$1,600.00 |
$1,600.00 |
|
|
|
|
|
|
|
|
|
|
|
3" limestone in place |
|
$3,430.14 |
$3,430.14 |
|
|
|
|
|
|
|
|
|
|
|
Pea gravel between buildings |
|
$5,635.33 |
|
|
|
|
|
|
|
|
|
|
$0.00 |
|
Undercuts and 3" stone |
|
$3,862.44 |
|
$3,862.44 |
|
|
|
|
|
|
|
|
|
|
Undercuts and 3" stone |
|
$957.74 |
|
$957.74 |
|
|
|
|
|
|
|
|
|
|
Pea Gravel |
|
$758.12 |
|
|
|
|
|
|
|
|
|
|
|
|
Pea Gravel |
|
$753.06 |
|
|
|
|
|
|
|
|
|
|
|
|
3" limestone |
|
$956.02 |
|
|
|
|
|
|
|
|
|
|
|
|
Extra excavation undercut parking |
|
$4,669.00 |
|
|
|
|
|
|
|
|
|
|
|
|
Compaction-c.y. on site material |
|
$1,667.50 |
|
|
|
|
|
|
|
|
|
|
|
3 |
Grade 9 - Delivered & placed |
* |
$308.00 |
$308.00 |
|
|
|
|
|
|
|
|
|
|
4 |
Credit for parking lot fill |
* |
($750.00) |
($750.00) |
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$24,647.35 |
$5,388.14 |
$4,820.18 |
$0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Vaughn Industrial Sales |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Misc Field Extras Jan 16, 1991 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B3 Shortened |
|
$1,515.00 |
|
|
|
|
|
|
|
|
|
|
|
|
Beams Shortened due to footings |
|
$2,400.00 |
|
|
|
|
|
|
|
|
|
|
|
|
B20 & B21 Wall moved |
|
$2,880.00 |
|
|
|
|
|
|
|
|
|
|
|
|
G5 & H4 Move & relocate |
|
$1,229.00 |
|
|
|
|
|
|
|
|
|
|
|
|
Use Crane to lower Air Handlers |
|
$600.00 |
|
|
|
|
|
|
|
|
|
|
|
|
Add Grating support steel |
|
$6,616.00 |
|
|
|
|
|
|
|
|
|
|
|
2 |
Cooling Tower Move |
|
$1,811.00 |
|
|
|
|
|
|
|
|
|
|
|
3 |
Roof Frame |
|
$613.00 |
|
|
|
|
|
|
|
|
|
|
|
|
Remove 2 frames, cut BEAM, 3 frames |
|
$770.00 |
$0.00 |
See Ed |
$770.00 |
|
|
|
|
|
|
|
|
|
Mason and Flexcore Repairs |
|
($1,220.00) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Credit for roof ladder |
|
($1,000.00) |
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$16,214.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
|
Cella Concrete, Inc. |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Additional curb, gutter, drive apron |
* |
$5,393.90 |
$5,393.90 |
|
|
|
|
|
|
|
|
|
|
2 |
Removal of curb on Wood Street |
* |
$200.00 |
$200.00 |
|
|
|
|
|
|
|
|
|
|
3 |
247.84 tons of CA-6 sub base |
* |
$2,664.28 |
$2,664.28 |
|
|
$0.00 |
$0.00 |
|
|
|
|
|
|
4 |
Replace 39.5 l.f. curb & gutter |
* |
$819.63 |
$819.63 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$9,077.81 |
$9,077.81 |
$0.00 |
|
$0.00 |
|
|
|
|
|
|
|
|
Northern Paving, Inc. |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Grade 9 gravel to #3 rock |
* |
$1,560.00 |
$1,560.00 |
|
|
|
|
|
|
|
|
|
|
2 |
Ground stabilization fabric |
* |
$1,000.00 |
$1,000.00 |
|
|
|
|
|
|
|
|
|
|
3 |
Raise Wood Street |
* |
$6,642.00 |
$6,642.00 |
|
|
|
|
|
|
|
|
|
|
4 |
Gravel for parking lot |
* |
$861.25 |
$861.25 |
|
$1,722.50 |
|
|
|
|
|
|
|
|
|
TOTAL |
|
$10,063.25 |
$10,063.25 |
$0.00 |
$1,722.50 |
|
|
|
|
|
|
|
|
|
Midwest Flexicore |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Extra trip charge |
|
$750.00 |
$750.00 |
|
|
|
|
|
|
|
|
|
|
2 |
Additional erection trip for slabs |
|
$2,000.00 |
$2,000.00 |
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$2,750.00 |
$2,750.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Regal Roofing Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Extra granuales |
* |
$1,600.00 |
$1,600.00 |
|
|
|
|
|
|
|
|
|
|
2 |
Move scuttle & curbs, reflash |
* |
$1,030.00 |
$1,030.00 |
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$2,630.00 |
$2,630.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
P & P Plumbing & Heating |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
1-hr labor for elevator drain |
* |
$50.00 |
$50.00 |
|
|
|
|
|
|
|
|
|
|
2 |
Layout walls |
* |
$100.00 |
|
$100.00 |
|
|
|
|
|
|
|
|
|
3 |
Layout walls |
* |
$150.00 |
|
$150.00 |
|
|
|
|
|
|
|
|
|
4 |
raise hangers |
* |
$100.00 |
$100.00 |
|
$100.00 |
|
|
|
|
|
|
|
|
5 |
Install sump in elevator pit |
* |
$289.00 |
$289.00 |
|
|
$0.00 |
|
|
|
|
|
|
|
6 |
Repair leak in hot water |
* |
$51.50 |
$51.50 |
|
$51.50 |
|
|
|
|
|
|
|
|
7 |
Install sink in president's office |
* |
$536.00 |
$536.00 |
|
|
|
|
|
|
|
|
|
|
8 |
Relocate plumbing in lunch room |
* |
$169.00 |
$169.00 |
|
|
|
|
|
|
|
|
|
|
9 |
Reroute 4" vent stack |
|
$623.00 |
|
|
|
|
|
|
|
|
|
|
|
10 |
Relocate cooling tower main |
|
$404.00 |
|
|
|
|
|
|
|
|
|
|
|
11 |
Credit for Change Order #6 |
* |
($51.50) |
($51.50) |
|
$151.50 |
|
|
|
|
|
|
|
|
12 |
Change east downspout |
* |
$161.00 |
$161.00 |
|
|
|
|
|
|
|
|
|
|
13 |
Add boiler drain in janitor's closet |
* |
$81.00 |
$81.00 |
|
|
|
|
|
|
|
|
|
|
14 |
Lower vent bar and move water line |
|
$254.00 |
|
|
|
|
|
|
|
|
|
|
|
15 |
Sink and faucet for Roy's lab |
* |
$420.00 |
$420.00 |
|
|
|
|
|
|
|
|
|
|
16 |
Install backflow preventor |
* |
$900.00 |
$900.00 |
|
|
|
|
|
|
|
|
|
|
17 |
Line for hood wash down |
* |
$800.00 |
$800.00 |
|
|
|
|
|
|
|
|
|
|
|
Vacuum breaker credit |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$5,037.00 |
$3,506.00 |
$250.00 |
|
Mohawk |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Waco Electric Corporation |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
120/240 V connection |
* |
$7,437.00 |
$7,437.00 |
|
|
|
|
|
|
|
|
|
|
2 |
Revised floor duct to flush type |
* |
$510.00 |
$510.00 |
|
|
|
|
|
|
|
|
|
|
3 |
Revised motor control center |
* |
($345.00) |
($345.00) |
|
|
|
|
|
|
|
|
|
|
4 |
Conduit under parking |
* |
$980.00 |
$980.00 |
|
|
|
|
|
|
|
|
|
|
5 |
Basement lighting |
* |
$6,679.00 |
$6,679.00 |
|
|
|
|
|
|
|
|
|
|
6 |
Cable tray system |
* |
($5,848.00) |
($5,848.00) |
|
|
|
|
|
|
|
|
|
|
7 |
UPS extra circuits |
* |
$5,171.00 |
$5,171.00 |
|
|
|
|
|
|
|
|
|
|
8 |
Install temp pole & trailer service |
* |
$968.42 |
$968.42 |
|
|
|
|
|
|
|
|
|
|
22 |
Install concrete pole bases |
* |
$1,711.50 |
$1,711.50 |
|
|
|
|
|
|
|
|
|
|
14 |
Extra phone conduit |
* |
$884.00 |
$884.00 |
|
|
|
|
|
|
|
|
|
|
9 |
2 additional outlets in vending area |
* |
$186.00 |
$186.00 |
|
|
|
|
|
|
|
|
|
|
10 |
Dishwasher in vending area |
* |
$134.00 |
$134.00 |
|
|
|
|
|
|
|
|
|
|
11 |
110 outlets in room 110 |
* |
$174.00 |
$174.00 |
|
|
|
|
|
|
|
|
|
|
12 |
Temp wiring to sump pumps and pit |
* |
$356.17 |
$356.17 |
|
|
|
|
|
|
|
|
|
|
13 |
Relocate boxes in room 110 |
* |
$118.42 |
$118.42 |
|
|
|
|
|
|
|
|
|
|
15 |
Connect fan coil & condensing unit |
* |
$637.00 |
$637.00 |
|
|
|
|
|
|
|
|
|
|
16 |
Mount cooling tower and reroute |
* |
$718.00 |
$718.00 |
(not to exceed) |
|
|
|
|
|
|
|
|
|
17 |
Connection for air compressor |
* |
$191.00 |
$191.00 |
|
|
|
|
|
|
|
|
|
|
18 |
110V circuit for elevator control |
* |
$228.00 |
$228.00 |
|
$0.00 |
|
|
|
|
|
|
|
|
19 |
3 circuits on roof |
* |
$627.00 |
$627.00 |
(not to exceed) |
|
|
|
|
|
|
|
|
|
20 |
3 extra circuits from panel to roof |
* |
$234.00 |
$234.00 |
|
|
|
|
|
|
|
|
|
|
21 |
Wiring for partitions and UPS |
* |
$4,255.00 |
$4,255.00 |
|
|
|
|
|
|
|
|
|
|
23 |
Fire alarm revisions |
* |
$5,321.00 |
$5,321.00 |
|
|
|
|
|
|
|
|
|
|
24 |
Outlet for telephone from UPS |
* |
$291.00 |
$291.00 |
|
|
|
|
|
|
|
|
|
|
25 |
Control switch and wiring for fan |
* |
$348.00 |
$348.00 |
|
|
|
|
|
|
|
|
|
|
26 |
Fixtures in stairwell |
* |
$272.00 |
$272.00 |
|
|
|
|
|
|
|
|
|
|
27 |
Terminations to furniture partition |
* |
$51.00 |
$51.00 |
|
|
Edwards |
|
|
|
|
|
|
|
28 |
UPS, fire alarm, phone, Alcan fix |
* |
$769.57 |
$769.57 |
|
|
|
|
|
|
|
|
|
|
29 |
Chiller control field wiring |
* |
$700.00 |
$700.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Clean up credit |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$33,759.08 |
$33,759.08 |
$0.00 |
|
|
|
|
|
|
|
|
|
|
Mohawk |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Pad in basement |
* |
$493.05 |
|
$493.05 |
|
|
|
|
|
|
|
|
|
1 |
Gravel, bobcat operator & concrete |
* |
$835.00 |
|
$835.00 |
|
|
|
|
|
|
|
|
|
2 |
3 finishers - 6 hrs each |
* |
$729.00 |
|
$729.00 |
|
|
|
|
|
|
|
|
|
3 |
Pea gravel & 2 finishers - 2 hrs |
* |
$522.00 |
|
$522.00 |
|
|
|
|
|
|
|
|
|
4 |
Concrete pad in baesment |
* |
$472.00 |
|
$472.00 |
|
|
|
|
|
|
|
|
|
5 |
Conveyor - 1/2 day |
* |
$550.00 |
|
$550.00 |
|
|
|
|
|
|
|
|
|
6 |
Conveyor - 1/2 day |
* |
$600.00 |
|
$600.00 |
$0.00 |
|
|
|
|
|
|
|
|
7 |
Conveyor - 1/2 day |
* |
$400.00 |
|
$400.00 |
|
|
|
|
|
|
|
|
|
8 |
Floor refinishing |
* |
$3,417.50 |
|
$3,417.50 |
|
|
|
|
|
|
|
|
|
9 |
Extras as agreed 1/8/91 |
* |
$9,500.00 |
|
$9,500.00 |
|
Vaughn |
|
|
|
|
|
|
|
|
TOTAL |
|
$17,518.55 |
$0.00 |
$17,518.55 |
|
Fran & Asso |
|
|
|
|
|
|
|
|
Capitol Glass |
|
|
|
|
$0.00 |
Waco |
|
|
|
|
|
|
|
1 |
Low E glass-west and south |
* |
$2,149.00 |
$2,149.00 |
|
|
Vaughn |
|
|
|
|
|
|
|
2 |
Mitered returns |
* |
$1,665.00 |
$1,665.00 |
|
|
Mohawk |
|
|
|
|
|
|
|
3 |
"J" 2nd order 48 +15 glass stop |
* |
$129.00 |
$129.00 |
|
|
Vaughn |
|
|
|
|
|
|
|
4 |
One (1) blank cylinder |
* |
$92.00 |
$92.00 |
|
|
Ruben |
|
|
|
|
|
|
|
5 |
Remove and reinstall atrium glass |
* |
$500.00 |
$500.00 |
|
|
|
|
|
|
|
|
|
|
6 |
Rebuild cutout for electric strike |
* |
$900.00 |
$900.00 |
|
$880.00 |
|
|
|
|
|
|
|
|
7 |
Remove & reinstall 2nd floor windows |
* |
$500.00 |
$500.00 |
|
|
Ruben |
|
|
|
|
|
|
|
8 |
Remove damaged mullion |
*562 |
$562.00 |
$562.00 |
|
|
|
|
|
|
|
|
|
|
9 |
Revision of #7-accept additional |
* |
$250.00 |
$250.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$0.00 |
|
|
|
|
|
|
|
|
|
TOTAL |
|
$6,747.00 |
$6,747.00 |
$0.00 |
|
|
|
|
|
|
|
|
|
|
Valley Automatic Sprinkler |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
60 suspended heads in basement |
* |
$2,100.00 |
$2,100.00 |
|
|
|
|
|
|
|
|
|
|
2 |
Connect to old building |
* |
$2,470.00 |
$2,470.00 |
|
|
|
|
|
|
|
|
|
|
3 |
Adjust height of basement sprinklers |
* |
$1,000.00 |
$1,000.00 |
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$4,570.00 |
$4,570.00 |
$0.00 |
|
|
|
|
|
|
|
|
|
|
Hendersons' Construction |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Setting door frames |
|
$1,872.00 |
$1,872.00 |
|
|
|
|
|
|
|
|
|
|
2 |
Repair wall at corner F5 |
|
$392.00 |
$392.00 |
|
|
|
|
|
|
|
|
|
|
3 |
Move wall at stair #3 2" |
|
$720.00 |
$720.00 |
|
|
|
|
|
|
|
|
|
|
4 |
Moving west wall of elec rm 2' east |
|
$550.00 |
$550.00 |
|
|
|
|
|
|
|
|
|
|
5 |
Cutting concrete & slab at elevator |
|
$468.00 |
$468.00 |
|
|
|
|
|
|
|
|
|
|
6 |
Repair block by steel beam 2E |
|
$360.00 |
$360.00 |
|
|
|
|
|
|
|
|
|
|
7 |
"16" extra brick |
|
$900.00 |
$900.00 |
|
$0.00 |
|
|
|
|
|
|
|
|
8 |
Misc extra |
|
$3,300.00 |
$3,300.00 |
|
|
|
|
|
|
|
|
|
|
9 |
repair & set doors |
|
$768.00 |
$768.00 |
|
|
|
|
|
|
|
|
|
|
10 |
5 rools plastic seal |
|
$313.50 |
$313.50 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$9,643.50 |
$9,643.50 |
$0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
R & G Interiors (Exterior) |
|
|
|
|
$0.00 |
|
|
|
|
|
|
|
|
1 |
Revise at north stairwell |
* |
$400.00 |
$400.00 |
|
|
|
|
|
|
|
|
|
|
2 |
Saturday overtime |
* |
$400.00 |
$400.00 |
|
|
|
|
|
|
|
|
|
|
3 |
Panzer mesh |
* |
$585.00 |
$585.00 |
|
|
|
|
|
|
|
|
|
|
4 |
Patch exterior Dryvit |
* |
$178.00 |
$178.00 |
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$1,563.00 |
$1,563.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
R & G Interiors (Interior) |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Personnel dept wall |
* |
$358.75 |
$358.75 |
|
|
|
|
|
|
|
|
|
|
2 |
Extra walls in kitchen & lunchroom |
* |
$503.40 |
$503.40 |
|
|
|
|
|
|
|
|
|
|
3 |
Credit for Capitol Glass charge |
* |
($1,000.00) |
($1,000.00) |
|
|
|
|
|
|
|
|
|
|
4 |
Drywall in stairwell and coffee room |
* |
$229.40 |
$229.40 |
|
|
|
|
|
|
|
|
|
|
5 |
Door in president's office |
* |
$109.10 |
$109.10 |
|
|
|
|
|
|
|
|
|
|
6 |
Framing under stairwell #1 |
* |
$158.65 |
$158.65 |
|
|
|
|
|
|
|
|
|
|
7 |
Revise #3-credit to be $500 |
* |
$500.00 |
$500.00 |
|
|
|
|
|
|
|
|
|
|
8 |
Double row of studs on atrium soffit |
* |
$376.50 |
$376.50 |
|
|
|
|
|
|
|
|
|
|
9 |
Frame & drywall soffits in hall |
* |
$593.65 |
$593.65 |
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$1,829.45 |
$1,829.45 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Edwards Engineering |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Elevator exhaust |
* |
$901.00 |
$901.00 |
|
|
|
|
|
|
|
|
|
|
3 |
T & M for gas pipeline |
* |
$552.00 |
$552.00 |
|
|
|
|
|
|
|
|
|
|
2 |
Training room per discussion |
* |
$6,695.00 |
$6,695.00 |
|
$0.00 |
|
|
|
|
|
|
|
|
4 |
Gas piping |
* |
$2,777.00 |
$2,777.00 |
|
|
|
|
|
|
|
|
|
|
5 |
Skylight area ductwork revision |
* |
$478.00 |
$478.00 |
|
|
|
|
|
|
|
|
|
|
6 |
Huymidifidation boiler flue stack |
* |
$184.00 |
$184.00 |
|
|
|
|
|
|
|
|
|
|
7 |
S1 & ER1 ductwork revision |
* |
$2,000.00 |
$2,000.00 |
|
|
|
|
|
|
|
|
|
|
8 |
Rerouting fan coil ductwork on 2nd |
* |
$256.00 |
$256.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$0.00 |
|
|
|
|
|
|
|
|
|
|
9 |
Flow switch installation |
* |
$138.00 |
$138.00 |
|
|
|
|
|
|
|
|
|
|
|
Generator cooling radiator inst |
|
|
$0.00 |
|
|
|
|
|
|
|
|
|
|
10 |
Credit for damaged mullion (Capitol) |
* |
($562.00) |
($562.00) |
|
|
|
|
|
|
|
|
|
|
11 |
Emergency generator remote piping |
* |
$1,793.00 |
$1,793.00 |
|
|
|
|
|
|
|
|
|
|
12 |
Scotts changes to Art's Area |
|
$292.00 |
$292.00 |
|
|
|
|
|
|
|
|
|
|
13 |
Paint EVASE credit |
|
($250.00) |
($250.00) |
|
|
|
|
|
|
|
|
|
|
14 |
Delete air leak test |
|
($454.00) |
($454.00) |
|
|
|
|
|
|
|
|
|
|
15 |
Delete Air Leak Test |
|
($1,000.00) |
($1,000.00) |
|
|
|
|
|
|
|
|
|
|
16 |
Stained Tile Credit |
|
($250.00) |
($250.00) |
|
|
|
|
|
|
|
|
|
|
17 |
Move grill in NW Hall not CAE |
|
$212.00 |
$212.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$13,762.00 |
$13,762.00 |
$0.00 |
|
|
|
|
|
|
|
|
|
|
Imperial |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$0.00 |
|
|
|
|
|
|
|
|
|
Knoll Steel |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Miscellaneous - Call Kenny |
|
$295.00 |
|
|
|
|
|
|
|
|
|
|
|
|
Set stack |
|
$1,535.00 |
|
|
|
|
|
|
|
|
|
|
|
|
Stairwell |
|
$1,920.00 |
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$3,750.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
|
|
Gritschke Engineering |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Generator, elevator room exhaust |
|
$1,170.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Norman Security |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
150 security cards |
* |
$1,035.00 |
$1,035.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$1,035.00 |
$1,035.00 |
$0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Campbell Decorating |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Cut in drop ceiling on 2nd floor |
* |
$700.00 |
$700.00 |
|
|
|
|
|
|
|
|
|
|
2 |
Labor & materials for lab floors |
* |
$800.00 |
$800.00 |
|
|
|
|
|
|
|
|
|
|
3 |
Finish carpeted areas by 3/13/91 |
* |
$400.00 |
$400.00 |
|
|
|
|
|
|
|
|
|
|
4 |
Epoxy paint in rooms 143,144,151 |
* |
$1,000.00 |
$1,000.00 |
|
|
|
|
|
|
|
|
|
|
5 |
Repair of walls around doors |
* |
$700.00 |
$700.00 |
|
|
|
|
|
|
|
|
|
|
6 |
Hang additional wallpaper |
* |
$936.00 |
$936.00 |
|
|
|
|
|
|
|
|
|
|
7 |
Repair of wallpaper around doors |
* |
$1,200.00 |
$1,200.00 |
|
|
|
|
|
|
|
|
|
|
8 |
Feather drywall in conference room |
* |
$160.00 |
$160.00 |
|
|
|
|
|
|
|
|
|
|
9 |
Credit for damaged kitchen tile |
* |
($90.00) |
($90.00) |
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$5,806.00 |
$5,806.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Dimensional Flooring |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Ceramic tile prep work |
* |
$524.00 |
$524.00 |
|
|
|
|
|
|
|
|
|
|
2 |
Polished tile for entry area |
* |
$597.00 |
$597.00 |
|
|
|
|
|
|
|
|
|
|
3 |
Repair tile in women's washroom |
* |
$106.25 |
$106.25 |
|
|
|
|
|
|
|
|
|
|
4 |
Install treads on main stairway |
* |
$1,031.00 |
$1,031.00 |
|
|
|
|
|
|
|
|
|
|
5 |
Resilient floor preparation |
* |
$1,037.50 |
$1,037.50 |
|
|
|
|
|
|
|
|
|
|
6 |
Replace damaged kitchen tile |
* |
$90.00 |
$90.00 |
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$3,385.75 |
$3,385.75 |
$0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hire-Nelson |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Base cabinets in conference room |
* |
$1,709.00 |
$1,709.00 |
|
|
|
|
|
|
|
|
|
|
2 |
Fabric for reception desks |
* |
$94.00 |
$94.00 |
|
|
|
|
|
|
|
|
|
|
3 |
Wall cap and base and chair rail |
* |
$1,400.00 |
$1,400.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$3,203.00 |
$3,203.00 |
$0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Noonan-Sullivan |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Additional 30 feet of Alcan ceiling |
* |
$250.00 |
$250.00 |
|
|
|
|
|
|
|
|
|
|
2 |
Class A tile in basement |
* |
$5,550.00 |
$5,550.00 |
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$5,800.00 |
$5,800.00 |
$0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Dover |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Dover back charge to L&G Compressor |
|
$125.00 |
$125.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Northern Carpet |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Floor prep |
* |
$300.00 |
$300.00 |
|
|
|
|
|
|
|
|
|
|
2 |
Basement carpet |
* |
$4,907.00 |
$4,907.00 |
|
|
|
|
|
|
|
|
|
|
3 |
864 ft cove base for basement |
* |
$903.31 |
$903.31 |
|
|
|
|
|
|
|
|
|
|
4 |
Floor patch for basement |
* |
$150.00 |
$150.00 |
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
$6,260.31 |
$6,260.31 |
$0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Landis & Gyr |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
|
($784.00) |
|
|
|
|
|
|
|
|
|
|
|
2 |
|
|
($380.00) |
|
|
|
|
|
|
|
|
|
|
|
3 |
|
|
($125.00) |
|
|
|
|
|
|
|
|
|
|
|
4 |
|
|
$450.00 |
|
|
|
|
|
|
|
|
|
|
|
5 |
|
|
($3,500.00) |
|
|
|
|
|
|
|
|
|
|
|
6 |
|
|
($125.60) |
|
|
|
|
|
|
|
|
|
|
|
7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
($4,464.60) |
$0.00 |
|
|
|
|
|
|
|
|
|