Sketch layout with short spec.
Get village permit
Use as little water as possible when mixing concrete. Trowel to a better finish than existing pad.
Buy and install cedar single board fence.
Use a non swivel caster on larger door.
Buy and install gate latch that can be pad locked.
Cover concrete with plastic for 48 hours after finishing.
Install groove in concrete about every 6-8 feet east to west. Dumpster wheels should not get stuck in grooves.
Glue caps on posts using silicone caulk
Have Palatine Village inspector inspect
Pass inspection.
Seal with Thompson concrete sealer after 2 months.
protect from snowplows and winter salt