IMPORTANT NOTE:
Before disconnection of utility power to work on transfer switch control be sure to call the fire alarm service company or fire department to have them ignore building trouble alarms for the duration of the repair. Repair should be completed in 1 day or less so that the building is not without an alarm system overnight. The alarm is intended to alert for fire but also serves as an indicator of loss of power to the sump pumps and other critical equipment. As soon as the repair is done call to restore alarm service.
s
Alarm Service _______________ or 911
CAE PIN # _______________
Definitions:
ES - Engine Start Agastat Model 7022AK 1-300 Second Time Delay off (Delays engine start for Power Loss) Set at 8 seconds.
NE - Time delay on relay for Normal (utility) to Emergency power. Set at 26 seconds after Power Loss.
EN- Time delay on relay for Emergency to Normal (utility) power. Set at 10 seconds.
EC- Time delay on relay for Engine Cutoff after Normal power is restored. Set at 30 seconds NOTE: EC DELAY MUST BE LONGER THAN EN.
I. Logic for Loss Of Utility Power
Time 0 + 8 seconds after loss of utility power
Time 0 + 8 + 18 = 26 seconds after loss of utility power
III. Logic for Test Switch in Test Position
Time 0 + 8 seconds after loss of utility power
Emergency Power will not transfer because ENTD on holds EN2 open
Time 0 + 8 + 18 seconds after loss of utility power
NE Relay Picks Up (after 10 Seconds time delay on)
IV. Restoring Test Switch to Auto Position
N Picks Up immediately
CONTACTS
N 1 - 2 NO Transfer Switch
N 3 NC E
N 4 NO EC
ES 1 NC Starts Engine (Agastat)
EN 1 NO N
EN 2 NC E & NE
EC 1 NC ES
NE 1 NO E
NE 2 NC N & ES
E 1 - 2 NO Transfer Switch
E 3 NC N