American
Ref-Fuel Company of Hempstead
600
Merchants Concourse
Westbury, NY 11590
516/683-5400
Plant
Contacts:
Patricia Motschmann pmotschm@ref-fuel.com
Operations
Manager - Steve Bossitti

Market
Area Business Manager - Derek Veenhof

Plant
Tour Information Form
Directions
to Facility
American
Ref-Fuel’s flagship facility, in Hempstead, New York,
opened for business in 1989. The Hempstead facility, Long
Island’s largest waste-to-energy plant, provides
environmentally safe municipal solid waste disposal for
the nation’s most populous township. It marks the
first United States installation of a globally successful
mass burn technology, Deutsche Babcock Anlagen.
The Hempstead
facility accepts delivery of waste six days a week and
processes on a 24-hours-a-day, seven days a week basis.
Steam created in the combustion process drives a 72-megawatt
turbine generator producing electricity for in-plant use
and for sale to the local utility. Three dry scrubber systems
control acid gases, as do fabric filters, minimizing the
release of particulates before exiting the exhaust stack.
The Hempstead
facility is the cornerstone of the town’s integrated
waste service plan that includes an extensive curbside
collection system for recyclable materials and a long-term
agreement with neighboring Brookhaven for disposal of ash
residue.
OSHA designated
the Hempstead plant a Star facility in 1994. American Ref-Fuel
Company of Hempstead set the OSHA Star standard for all
other waste-to-energy facilities in the nation, as it received
the very first Star in the industry. |
|
Key
Project Facts
Service
Area: Town of Hempstead
Owner/Operator: American
Ref-Fuel Company of Hempstead
Contract
Term: 20 years with provisions for extensions
Financing
Method: Tax-exempt Revenue Bonds plus private
equity
Waste
Supply: Town guarantees to deliver a minimum
of 540,000 tons per year
Energy
Market: Electricity sales to Long Island Power
Authority
Capacity: 2,505
tons per day
Number
of Process Lines: Three @ 835 tons per day
Type
of Stoker Grate: Duesseldorf Roller Grate
Steam
Conditions at Boiler Outlet: 225,000 lbs/hr
@ 870 psia/842º F
Turbine-Generator: One
72-megawatt nominal condensing unit
Air
Quality Control: Three dry scrubber systems
followed by three fabric (baghouse) systems
Stack
Height: 382 feet
Bunker
Capacity: 15,000 tons
Secondary
Materials Recovery: Recovery of ferrous materials
from post-incinerated ash
Hempstead was accepted into the
EPA's Performance Track Program in 2002. This is a voluntary
partnership program that recognizes and encourages top
environmental performers. The program is a counterpart
to OSHA's VPP recognition of superior health and safety
- a program in which the Hempstead plant had been the first
waste-to-energy facility in the nation to attain the VPP
Star designation. |
The CleanAir - Hempstead main
focus to increase value.
Increase annual power sales
Increase annual through-put
Improve community relations to enable future construction
Convince US Congress that Waste Energy is Green Energy
Improve testing efficiency
|
|
Engineering Metrics |
Year 2000 |
Capacity |
|
Design Capacity, Tons/day |
2505 |
Actual Capacity |
2800 |
Permit Limit |
2400 |
|
|
Heat Input |
|
BTU/lb |
5200 |
Max Total BTU/hr (all boilers) |
1,040,000,000 |
|
|
Outputs |
|
Steam, #/hr (set pt) |
230,000 |
Steam, #/hr (3 boilers) |
690,000 |
Steam BTU/# @870psia/842°F |
|
Electricity, Megawatts |
72 |
BTU/hr/Megawatt |
3,413,668 |
Equivalent Btu/hr for Megawatts |
245,784,120 |
Boiler Eficiency |
|
Turbine Efficiency |
|
Overall thermal Efficency |
24% |
|
|
Recycle Material |
|
|
|
Input Waste Streams |
Tons/year |
City of Hempstead, Tons/yr |
540,000 |
Brookhaven, Tons/yr |
175,200 |
Special, Tons/yr |
100 |
TransRiver, Tons/yr |
100,000 |
Spot Market, Tons/yr |
60,700 |
TOTAL, Tons/yr |
876,000 |
Tons/Day |
2,400 |
|
|
|
|
Output |
|
|
|
Market |
|
Hempstead Guarantee |
|
Brookhaven Guarantee |
|
|
|
To get, Ton/yr |
|
Cost per ton |
|
|
|
Special |
|
|
|
Financial Metrics |
|
Throughput Opportunities |
|
|
|
|
|
RONA |
|
Year funded |
1989 |
Plant Cost |
350,000,000 |
Public Funds, % |
90% |
Private Funds |
35,000,000 |
|
|
Electricity Bulk Rate Estimate |
|
Bulk rate Electric $/KWH |
$0.10 |
Avalibility |
95% |
KWH/Year |
630,720,000 |
Electricity Sales |
$59,918,400 |
|
|
Tipping |
|
Dollars/ton |
$30 |
Tipping Sales |
$4,821,000 |
|
|
Other Sales |
$6,216,600 |
|
|
Total Sales Est |
$70,956,000 |
$ per ton |
$81 |
|
|
|