1 3 Hempstead Resource Recovery Facility
American Ref-Fuel  
"...creating tomorrow's energy from today's waste."
 

Hempstead Resource Recovery Facility

American Ref-Fuel Company of Hempstead
600 Merchants Concourse
Westbury, NY 11590
516/683-5400

Plant Contacts:
Patricia Motschmann          pmotschm@ref-fuel.com

Operations Manager - Steve Bossitti

Steve

Market Area Business Manager - Derek Veenhof

Derek

Plant Tour Information Form

Directions to Facility


American Ref-Fuel’s flagship facility, in Hempstead, New York, opened for business in 1989. The Hempstead facility, Long Island’s largest waste-to-energy plant, provides environmentally safe municipal solid waste disposal for the nation’s most populous township. It marks the first United States installation of a globally successful mass burn technology, Deutsche Babcock Anlagen.

The Hempstead facility accepts delivery of waste six days a week and processes on a 24-hours-a-day, seven days a week basis. Steam created in the combustion process drives a 72-megawatt turbine generator producing electricity for in-plant use and for sale to the local utility. Three dry scrubber systems control acid gases, as do fabric filters, minimizing the release of particulates before exiting the exhaust stack.

The Hempstead facility is the cornerstone of the town’s integrated waste service plan that includes an extensive curbside collection system for recyclable materials and a long-term agreement with neighboring Brookhaven for disposal of ash residue.

OSHA designated the Hempstead plant a Star facility in 1994. American Ref-Fuel Company of Hempstead set the OSHA Star standard for all other waste-to-energy facilities in the nation, as it received the very first Star in the industry.

Key Project Facts

Service Area: Town of Hempstead

Owner/Operator: American Ref-Fuel Company of Hempstead

Contract Term: 20 years with provisions for extensions

Financing Method: Tax-exempt Revenue Bonds plus private equity

Waste Supply: Town guarantees to deliver a minimum of 540,000 tons per year

Energy Market: Electricity sales to Long Island Power Authority

Capacity: 2,505 tons per day

Number of Process Lines: Three @ 835 tons per day

Type of Stoker Grate: Duesseldorf Roller Grate

Steam Conditions at Boiler Outlet: 225,000 lbs/hr @ 870 psia/842º F

Turbine-Generator: One 72-megawatt nominal condensing unit

Air Quality Control: Three dry scrubber systems followed by three fabric (baghouse) systems

Stack Height: 382 feet

Bunker Capacity: 15,000 tons

Secondary Materials Recovery: Recovery of ferrous materials from post-incinerated ash


Hempstead was accepted into the EPA's Performance Track Program in 2002. This is a voluntary partnership program that recognizes and encourages top environmental performers. The program is a counterpart to OSHA's VPP recognition of superior health and safety - a program in which the Hempstead plant had been the first waste-to-energy facility in the nation to attain the VPP Star designation.

The CleanAir - Hempstead main focus to increase value.

Increase annual power sales

Increase annual through-put

Improve community relations to enable future construction

Convince US Congress that Waste Energy is Green Energy

Improve testing efficiency

 
Engineering Metrics
 Year 2000
Capacity
Design Capacity, Tons/day 2505
Actual Capacity 2800
Permit Limit 2400
Heat Input
BTU/lb 5200
Max Total BTU/hr (all boilers) 1,040,000,000
Outputs
Steam, #/hr (set pt) 230,000
Steam, #/hr (3 boilers) 690,000
Steam BTU/# @870psia/842°F
Electricity, Megawatts 72
BTU/hr/Megawatt 3,413,668
Equivalent Btu/hr for Megawatts 245,784,120
Boiler Eficiency
Turbine Efficiency
Overall thermal Efficency 24%
Recycle Material
Input Waste Streams Tons/year
City of Hempstead, Tons/yr 540,000
Brookhaven, Tons/yr 175,200
Special, Tons/yr 100
TransRiver, Tons/yr 100,000
Spot Market, Tons/yr 60,700
TOTAL, Tons/yr 876,000
Tons/Day 2,400
Output
Market
Hempstead Guarantee
Brookhaven Guarantee
To get, Ton/yr
Cost per ton
Special
Financial Metrics  
Throughput Opportunities
RONA
Year funded 1989
Plant Cost 350,000,000
Public Funds, % 90%
Private Funds 35,000,000
Electricity Bulk Rate Estimate
Bulk rate Electric $/KWH $0.10
Avalibility 95%
KWH/Year 630,720,000
Electricity Sales $59,918,400
Tipping
Dollars/ton $30
Tipping Sales $4,821,000
Other Sales $6,216,600
Total Sales Est $70,956,000
$ per ton $81

 